EasyManua.ls Logo

ABB ACS800-04 - Page 18

ABB ACS800-04
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Drive module of frame size R7 with bottom exit
18
16 Fasten the roof plate:
1. Cut an opening to the roof
wire mesh for the upper edge
of the air baffle. Place the
mesh on the top of the
enclosure frame.
2. Fasten the enclosure roof
plate above the mesh with four
50 mm spacers at the corners.
17 Fasten the door devices. See RPMP-11/13 Control Panel Mounting Platform Kit Installation Guide [3AFE68400643
(English)].
Install the ventilation gratings on the door:
1. Cover the edges of the cuttings with copper tape.
2. Fasten the metal gratings (2a) and the EMC compatible fan-and-air-filter unit (2b).
3. Place the metal mesh between the lower grating and the outer louvred grating.
4. Push the louvred grating onto its place.
18 Fasten the EMC gasket strip to the door as shown on page 13.
Step Instruction Photo
1
2
1
3
4
Cutting
View of the EMC compatible
fan-and-air-filter unit on the
back side of the door
2a
2b
2a
2a

Table of Contents

Other manuals for ABB ACS800-04

Related product manuals