Section-10
04-3006_S10_TDS_ABB_DPA_UPSCALE_RI_10-80kW_EN_150316.doc Page 13/16 ABB
Modifications reserved
10.11 INSTALLATION PLANNING
DPA UPScale RI is a rack independent design which is always mounted into a rack. The hosting rack must have
front and back opening for that air flow. The cold or ambient temp. air inlet is on the front; the hot air outlet is on the
back. Back clearance of min. 20 cm is required for hot air outlet.
Totally front accessibility for service and maintenance
Back clearance of min. 20 cm required for hot air outlet. Cold air inlet is from front.
see operating manual, Section 1 for details and mounting instructions.
From the bottom on the rear side.
10.11.1 HEAT DISSIPATION PER MODULE WITH NON-LINEAR LOAD
Heat Dissipation with 100% NNL
4)
per Module
Heat Dissipation with 100% NNL
4)
Load per Module
Airflow (25° - 30°C) with NNL
4)
Load per Module
4)
NLL means Non-Linear Load according to IEC/EN 62040-3.
Figure 1: a typical installation scheme of an RI subrack.