Section-2
04-3006_S2_OPM_ABB_DPA_UPSCALE_RI_10-80kW_EN_150316.doc Page 2/14 ABB
Modifications reserved
2.1 BLOCK DIAGRAM
2.1.1 WIRING AND BLOCK DIAGRAMS FOR ALL FRAMES AND MODULES
The customer has to supply the wiring to connect the UPS to the local power source. The installation inspection
and initial start up of the UPS and extra battery cabinet must be carried out by a qualified service personnel
such as a licensed service engineer from the manufacturer or from an agent certified by the manufacturer.
2.1.2 RECOMMENDED CABLE SECTIONS & FUSE RATINGS
2.1.2.1 Terminal connections overview
Terminals (T)
Connection Bar (B)
Separate. Battery
(+ / N / - )
Common
Battery
(+ / N / - )
3 x 50 mm
2
(T)
+ N 70/95 mm
2
(T)
3 x 50 mm
2
(T)
+ N 70/95 mm
2
(T)
3 x 50 mm
2
(T)
+ N 70/95 mm
2
(T)
n.a. = not allowed
UPScale RI 11, RI 12, RI 22, RI 24
(on rear site)
UPScale RI 10 UPScale RI 20
(on rear site) (on rear site)
UPScale RI 40
(on rear site)