Section-10
04-3006_S10_TDS_ABB_DPA_UPSCALE_RI_10-80kW_EN_150316.doc Page 14/16 ABB
Modifications reserved
10.12 WIRING AND BLOCK DIAGRAMS FOR ALL FRAMES AND MODULES
The customer has to supply the wiring to connect the UPS to the local power source. The installation inspection
and initial start up of the UPS and extra battery cabinet must be carried out by a qualified service personnel such
as a licensed service engineer from the manufacturer or from an agent certified by the manufacturer.
More details and procedure are mentioned in the user manual.
10.12.1 TERMINAL CONNECTIONS OVERVIEW
Terminals (T)
Connection Bar (B)
Separate. Battery
(+ / N / - )
Common
Battery
(+ / N / - )
3 x 50 mm
2
(T)
+ N 70/95 mm
2
(T)
3 x 50 mm
2
(T)
+ N 70/95 mm
2
(T)
3 x 50 mm
2
(T)
+ N 70/95 mm
2
(T)
n.a. = not allowed
UPScale RI 11, RI 12, RI 22, RI 24 (on rear site)
UPScale RI 10 (on rear site) UPScale RI 20 (on rear site)
UPScale RI 40 (on rear site)