EL3060 CONTINUOUS GAS ANALYZERS | OI/EL3060-EN REV. A 45
Integrity of the housing of the EL3060-Uras26 analyzer unit
• Is the housing of the analyzer unit intact?
• Are all flame barriers and screw plugs present?
• In the case of horizontal assembly of the analyzer unit: Are the O-rings,
which have been inserted in the grooves provided between the bottom
of the case and the case and between the case and the case cover, clean
and not pinched?
• Have all components of the housing been completely bolted together
and locked against rotation with the socket-head hex screws?
Integrity of the housing of the control unit
• Is the housing of the control unit intact?
• Is the housing of the control unit tightly closed?
• Is the housing cover screwed in all the way and locked against rotation
with the socket-head hex screw?
• Is the seal in the cover of the terminal housing intact? Is the cover of the
terminal housing tightly closed?
• Are all screwed cable glands present and tightly screwed in?
• Are the openings of the unused screwed cable glands tightly closed with
sealing plugs?
Connection of the peripheral units
• Are all devices needed for gas conditioning, calibration and waste gas
disposal correctly connected and ready for use?