EasyManua.ls Logo

ABB EasyLine EL3060 Series - Installing the Gas Analyzer; Unpacking the Gas Analyzer

ABB EasyLine EL3060 Series
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
30 EasyLine EL3060 Series Commissioning Instructions
Installing the Gas Analyzer
Unpacking the Gas Analyzer
ATTENTION
The EL3060-CU control unit weighs approx. 20 kg. The EL3060-
Uras26 analyzer unit weighs approx. 25 kg.
Unpacking and installing of the gas analyzer require two persons!
Unpacking the Gas Analyzer
1 Remove the accessories (see scope of supply and delivery, page 15)
from the shipping box.
Ensure that the accessories do not get lost.
2 Remove the gas analyzer from the shipping box together with the
respective protective packaging.
3 Remove the protective packaging and place the gas analyzer in a
clean location.
4 Remove the adhesive packaging residues from the gas analyzer.
NOTE
Keep the shipping box and the protective packaging for future shipping
needs.
If there is shipping damage which indicates improper handling, file a
damage claim with the shipper (rail, mail or freight carrier) within seven
days.

Table of Contents

Related product manuals