EasyManuals Logo

ABB IRB 1010 User Manual

ABB IRB 1010
334 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #271 background imageLoading...
Page #271 background image
NoteAction
xx2200000045
Carefully rotate the motor to make its motor con-
nector to a levelled position.
5
xx2200000046
Carefully lift out the motor.
CAUTION
Be aware of the connector that is still connected!
The motor cannot be removed completely until
the connector is disconnected.
6
xx2200000538
Disconnect the connector.
FB5
Tip
Take photos of the connector and cable position
before disconnecting them, to have as a reference
when reconnecting.
7
Refitting the axis-5 motor
Use these procedures to refit the axis-5 motor.
Refitting the axis-5 motor
NoteAction
Arrange the cable package as follows:
Cablings out from the process hub
- air hoses
- CP/CS cabling (connector R2.C1)
- axis-5 motor cablings (connectors MP5
and FB5)
Cablings out from the right side of wrist
unit (facing the tool flange)
- axis-6 motor cablings (connectors MP6
and FB6)
- pressure relief pipe connector
1
Check that:
all assembly surfaces are clean and without
damages
the motor is clean and undamaged.
2
Continues on next page
Product manual - IRB 1010 271
3HAC081964-001 Revision: B
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.5.3 Replacing the axis-5 motor
Continued

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB IRB 1010 and is the answer not in the manual?

ABB IRB 1010 Specifications

General IconGeneral
BrandABB
ModelIRB 1010
CategoryRobotics
LanguageEnglish

Related product manuals