EasyManua.ls Logo

ABB PST - Connection

ABB PST
180 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Low Voltage Products & Systems 15
ABB Inc. • 888-385-1221 • www.abb-control.com AC 1006.9 - 5/03
Chapter 2 - Quickstart
This chapter is a short guide on how to connect, configure and start
the softstarter in the quickest and safest way.
Warning!
Mounting and installing the softstarter shall be done in accor-
dance with local laws and regulations and must be performed
by authorized personnel only.
Do not change any parameters in the Service Settings menu.
2:1 Connection
1. Mount the softstarter according to Chapter 4 “ Mounting” .
2. Be aware of the ambient temperature.
Derating is required above 40 °C (104 °F). See Chapter 3 for
more information.
3. Connect the main circuit: terminals 1L1 - 3L2 - 5L3 to the line
side and terminals 2T1 - 4T2 - 6T3 to the motor side.
4. Connect the control voltage: terminals 1 and 2
(100-250V 50/60Hz).
5. Connect the functional ground: terminal 3.
The wire shall be as short as possible, and be connected to the
mounting plate.The mounting plate should also be grounded.
6. Connect the start/stop circuits: terminal 4, 5, 8, 9 and 10 accord-
ing to Figure 2.
7. Verify that the main and control voltage corresponds to the
softstarter ratings.
8. Switch on the control voltage.
9. The green “Power on” LED should be lit and the LCD should
appear as shown in Figure 3.
U= 0% I=0.0A
Menu
Figure 1:
1 Status indication LEDs
2 LCD display
3 Selection keys for selecting, changing
and storing parameters
4 Navigation keys for navigating in the
menus
* Arrows shown in the display indicate
that the value/menu is possible to
change or scroll
Figure 2: Standard connection PST
Power on ProtectionFault
U = 0% I=0.0A
Menu
Figure 3: Top level

Table of Contents

Related product manuals