EasyManua.ls Logo

ABB PST - Page 72

ABB PST
180 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
72 Low Voltage Products & Systems
AC 1006.9 - 5/03 ABB Inc. 888-385-1221 www.abb-control.com
Chapter 7 - Settings and configuration
Step down
Set the level of the step down voltage. This function is only
present if softstop is selected.
Current limit (Current Lim)
Set the current limit level for the start.
Overload Class (OL Class)
Select the desired overload class.
The configuration of the basic setting menu is now completed. It is
possible to return to the top level by pressing
Back
3 times.

Table of Contents

Related product manuals