EasyManua.ls Logo

ABB RED615 - Page 75

ABB RED615
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PHIPTOC1
BLOCK
ENA_MULT
OPERATE
START
PHIPTOC1_OPERATEX120_BI1_EXT_OC_BLOCKING
PHIPTOC1_START
DPHHPDOC1
BLOCK
ENA_MULT
NON_DIR
OPERATE
START
DPHLPDOC1
BLOCK
ENA_MULT
NON_DIR
OPERATE
START
DPHLPDOC2
BLOCK
ENA_MULT
NON_DIR
OPERATE
START
DPHLPDOC2_OPERATE
DPHHPDOC1_OPERATE
DPHLPDOC1_OPERATE
DPHHPDOC1_START
DPHLPDOC1_START
DPHLPDOC2_START
OR6
B1
B2
B3
B4
B5
B6
O
DPHLPDOC2_OPERATE
DPHHPDOC1_OPERATE
DPHLPDOC1_OPERATE
DPHxPDOC_OPERATE
GUID-54378804-2337-4274-83AD-186C666871E0 V1 EN
Figure 59: Overcurrent protection functions
The upstream blocking from the start of the instantaneous as well as the high stage
overcurrent protection function is connected to the binary output X110:SO1. This
output can be used to send a blocking signal to the relevant overcurrent protection
stage of the protection relay at the upstream bay.
OR6
B1
B2
B3
B4
B5
B6
O
UPSTREAM_OC_BLOCKINGPHIPTOC1_START
GUID-A8F61C44-1CA7-4B82-8271-52E1469CDF37 V1 EN
Figure 60: Upstream blocking logic
Three stages are provided for directional earth-fault protection. According to the order
code, the directional earth-fault protection method can be based on conventional
directional earth-fault DEFxPDEF only or alternatively together with admittance-
based earth-fault protection EFPADM, wattmetric-based earth-fault protection
WPWDE or harmonics-based earth-fault protection HAEFPTOC. In addition, there is
a dedicated protection stage INTRPTEF either for transient-based earth-fault
protection or for cable intermittent earth-fault protection in compensated networks.
1MRS758127 C Section 3
RED615 standard configurations
RED615 69
Application Manual

Table of Contents

Other manuals for ABB RED615

Related product manuals