Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30
Maintenance
5
Cleaning the compressor during
operation
5.3
Page 58
© Copyright 2016 ABB. All rights reserved.
December 2016 HZTL2481_EN Revision B
Screw in sealing plug (X).
Push the valve activator (Y) against the spring and hold it for 10 ... 15
seconds until the entire volume of water has been injected.
After cleaning, wait at least 5 minutes to allow turbocharger to dry.
NOTICE
If the cleaning operation is not satisfactory, it may be repeated up to
two times.
If the cleaning result is still not satisfactory after three attempts and the
engine values are also unsatisfactory, we recommend that you have the
turbocharger inspected and cleaned by an official ABB Turbocharging
Service Station.
Cleaning parameters per turbocharger compressor
Product
Engine load
Contents of cleaning medium vessel
[dm
3
]
TPL69-A 5085% 0.4
TPL73-A
1.0
TPL77-A 1.0