EasyManuals Logo

ABL WALLBOX eMH1 User Manual

ABL WALLBOX eMH1
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #8 background imageLoading...
Page #8 background image
| Installation – Installation site requirements
8
Installation
It is recommended to have the entire installation of the wallbox carried out by a qualified specialist electrical con-
tractor.
Electrical installation, final testing and certification for operation must be carried out by a qualified
specialist electrical contractor, who, on the basis of their specialist training and experience, as well as
their knowledge of the relevant standards, is able to assess and carry out the working steps described in
this manual and recognise potential hazards.
Installation site requirements
The installation site must be freely accessible.
The mounting surface must be level and solid.
The mounting surface must measure at least 272
x 222 mm (height x width).
222 mm
272 mm
The installation height should be between 140
and 160 cm (ground to bottom edge of housing).
Minimum distances to other technical installa-
tions must be observed.
Ideally, the installation site should provide a ready
connection to the electricity grid. Otherwise, a
separate power supply cable must be installed.
140
to
160 cm

Other manuals for ABL WALLBOX eMH1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABL WALLBOX eMH1 and is the answer not in the manual?

ABL WALLBOX eMH1 Specifications

General IconGeneral
ModeleMH1
ManufacturerABL
Connector TypeType 2
InstallationWall-mounted
Protection ClassIP54
Input Voltage400 V
Voltage230/400 V
CategoryWallbox
Charging Power11 kW
Charging Current16 A
Operating Temperature-25°C to +50°C
CommunicationModbus

Related product manuals