2/2
B 400
Before starting up the leak detector
ASM 182 series
GB 01667 - Edition 02 - September 04
Check the oil level of
the roughing pump
(ASM 182 T)
Maintenance of the primary pump E 750
The pump has been drained: a
label afxed on the cover of the
unit indicates this and the lling
oil is supplied.
The pump will be damaged if it runs without oil.
(> 5 mn).
The oil required for the first use is supplied with the detector.
Replacement of oil is the user’s responsability.
The pumps have been tested with ALCATEL 200 oil.
The technical characteristics of the pump are
guaranteed only with the recommended oil.