Installation
Check the oil level of
the roughing pump
(ASM 192 T / T2)
Maintenance of the primary pump E 750
The pump has been drained: a
label afxed on the cover of the
unit indicates this and the lling
oil is supplied.
The pump will be damaged if it runs without oil.
(> 5 mn).
The oil required for the first use is supplied with the detector.
Replacement of oil is the user’s responsability.
The pumps have been tested with ALCATEL 200 oil.
The technical characteristics of the pump are
guaranteed only with the recommended oil.
Position the unit so there is no possible risk of it falling or tilting.
The leak detector is equipped with 4 pivoting wheels without brake,
(2 wheels with brake on the console version).
So:
If the detector is placed on a high surface, the operator should take
care to lock the wheels of the detector.
It’s forbidden to place the leak detector on a sloping surface (> 1 %)
without take precautions for its translation stop.