EasyManua.ls Logo

Advanced Poly-Packaging T-1000 - Page 19

Advanced Poly-Packaging T-1000
142 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
CAUTION: The seal bar should not come in contact with the funnel during sealing. Raise the funnel
to avoid contact.
CAUTION: To avoid injury, do not operate the T-1000-S14 without a funnel, guard or covers properly
positioned. APPI offers a variety of funnels and chutes. Guarding may need to be added to prevent
operators from reaching in, around or under the guard or funnels.
CAUTION: To avoid injury, do not reach underneath guards while the machine is plugged in.
Machine Height Adjustment: The height of the T-1000-S14 is adjustable. To change the height of the
machine, three people are required; two people holding the weight of the machine, and one person
loosening the two bolts located on the leg, and clamping the outer leg to the inner leg. See Figure 2-2.
Raise or lower the T-1000-S14 to the desired height, and tighten the two bolts.
CAUTION: Unless properly supported, the T-1000-S14 will drop suddenly when loosening the height
adjustment bolts. This may cause damage to the machine or injury to individuals.
CAUTION: Do not attempt to adjust the height without the assistance of at least two other people
supporting the weight.
Air and Power Hookup
This section describes how to hook up air and power and the air and power requirements.
Note: A qualified electrician should ensure power outlets are the required 115 VAC and properly
grounded before hooking up power. If the unit is not properly grounded, it will produce a shock and
the machine will not work properly.
The air supply should be fed to the T-1000-S14 with 3/8 ID flexible tubing. This tubing affixes to the
coupler adapter (quick disconnect not provided). Connect the air to the regulator by holding the regulator
firmly in one hand and pushing the airline connector on the male regulator connector. After connecting
air, the regulator should be adjusted so the gauge reads 60 PSI (413.68 kPa). Insert the T-1000-S14 power
cord into a 115 VAC, 60 Hz, grounded power outlet.

Table of Contents

Other manuals for Advanced Poly-Packaging T-1000