EasyManua.ls Logo

Advanced Poly-Packaging T-1000 - Chapter 5: Parts

Advanced Poly-Packaging T-1000
142 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
76
Preventative Maintenance Checklist
CHART
ITEM DESCRIPTION PERIOD
Filter / Air regulator
Drain water from filter
D
Air regulator
Adjust pressure to 60 PSI
D
Anti-jam device
Check operation, adjust as needed (section 4.11)
D
Pressure bar (rubber)
Clean with alcohol
D
Perforation sensor
Clean sensor assembly with alcohol
W
Upper (rubber) roller
Inspect for nicks or cuts; clean with alcohol
W
Lower (alum.) roller
Clean with alcohol
W
Micron filter / Ventura
Inspect for contamination of filter, replace as needed
Inspect for blockage / air restriction
M
Wiring / Connectors
Inspect for loose wiring / connectors, tighten as needed
M
Air lines / Valves /
Cylinders
Inspect for loose air lines, listen for leaks, tighten or replace
poly tubing as needed
M
Compartments / Covers
Remove all covers, clean and blow out compartments with
compressed air to remove dust and dirt
M
Side-plates
Clean and wipe down with lightweight oil (based upon
environmental humidity conditions)
M
Drive belt
Inspect for wear / fraying, replace if needed
M
Drive belt (right panel)
Inspect for looseness, tighten as required
M
Touch screen cabinet /
arms
Tighten set screws
M
Height adjustments screws
Tighten bolts
M
CAUTION: Unplug power cord and disconnect air line prior to removing guards, funnels or covers.
Preventative maintenance must be performed by qualified maintenance personnel.
Legend for Preventative Maintenance Checklist:
D
Daily
W
Weekly
M
Monthly

Table of Contents

Other manuals for Advanced Poly-Packaging T-1000