EasyManua.ls Logo

AERMEC VXT - Selecting the type of circuit to the condenser (geothermy or well water); Selecting the presence;absence of a system storage tank; Selecting the position of the regulation probe (storage tank or system); Selecting presence;absence of an external air probe

AERMEC VXT
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
29
4
Selecting the type of circuit to the condenser (geo-
thermy or well water)
The following operations must be performed:
• Press key B;
• Hold down key C or A to set the selection;
• Press key B to confirm;
• Press key C to pass to the next window;
5
Selecting the presence/absence of a system
storage tank
The following operations must be performed:
• Press key B;
• Hold down key C or A to set the selection;
• Press key B to confirm;
• Press key C to pass to the next window
6
Selecting the position of the regulation probe (stora-
ge tank or system)
The following operations must be performed:
• Press key B;
• Hold down key C or A to set the selection;
• Press key B to confirm;
• Press key C to pass to the next window;
7
Selecting presence/absence of an external air probe
• Press key B;
• Hold down key C or A to set the selection;
• Press key B to confirm;
• Press key C to pass to the next window;
Prg
Esc
The unit is:
1.Geother.20% Glyc
A
B
C
I3
2.Geother.10% Glyc
3.Well water 3
Prg
Esc
The unit use the
A
B
C
I4
plant tank ? Yes
Prg
Esc
The probe uses in
A
B
C
I5
regulating the
Noaccumulation?
Prg
Esc
The unit has the
A
B
C
I6
probe outdoor air?
Yes

Related product manuals