Introduction
Agilent 5100 and 5110 ICP-OES Site Preparation Guide 19
2. Introduction
This publication contains the information required to successfully
prepare a site for an Agilent ICP-OES system installation.
On completion of the site preparation, fill in the checklist on Page 4,
(striking out those entries not applicable), and send this checklist to
your local Agilent agent or Agilent sales and service office. As soon
as it is received, Agilent or its agent will contact you to arrange a
convenient time for installation.
If you have difficulty in preparing for the installation, and for details
of operator training courses, please contact your Agilent sales or
field service representative.
Installation Guidelines
Allow a minimum of one day for the installation of the Agilent
ICP-OES system by an Agilent field service engineer.
The installation will include the following:
Spectrometer installation
Water chiller connection
Instrument software installation and registration
Accessory installation
Spectrometer installation performance tests
Basic customer training
Maintenance overview