Instrument Shipping Information
34 Agilent 5100 and 5110 ICP-OES Site Preparation Guide
Seismic Requirements
If necessary, insert tie down brackets into mounting slots, create
corresponding holes in the table, and secure the brackets with bolts.
NOTE
Seismic brackets are not supplied by Agilent. Prepare these items separately.
Figure 6. Slots for seismic tie down
Right side Left side
3 mm
17 mm
30 mm
Bracket
(example)