EasyManua.ls Logo

Agilent Technologies 7697A - Page 58

Agilent Technologies 7697A
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
58 Maintenance
3 Maintenance
8
With the transfer line installed, attach the transfer line
support bracket.
9 Make sure the carrier gas is connected to the GC- MS
system in the appropriate configuration. Begin supplying
carrier gas to the system. Refer to the Installation and
First Startup manual for more information.
10 Heat the cool on- column inlet to operating temperature.
11 Retighten the fittings, if necessary.
12 Refer to the documentation supplied with your cool
on- column inlet for more information.

Other manuals for Agilent Technologies 7697A

Related product manuals