58 Maintenance
3 Maintenance
8
With the transfer line installed, attach the transfer line
support bracket.
9 Make sure the carrier gas is connected to the GC- MS
system in the appropriate configuration. Begin supplying
carrier gas to the system. Refer to the Installation and
First Startup manual for more information.
10 Heat the cool on- column inlet to operating temperature.
11 Retighten the fittings, if necessary.
12 Refer to the documentation supplied with your cool
on- column inlet for more information.