9-1
9 Supplemental Verification Tests
The procedures in this chapter test the electrical performance of the signal generator.
These tests do not require access to the interior of the instrument.
This chapter contains the following information:
Required Test
Equipment A list of all the equipment required to perform these supplemental
verification tests. For a comprehensive list of all test equipment
required to perform these tests plus the manual adjustments, the
manual performance tests, and the automated adjustments and
performance tests, see Chapter 5, “Service.”
Supplemental
Verification Tests A list of all the equipment required to perform these supplemental
verification tests. For a comprehensive list of all test equipment
required to perform these tests plus the manual adjustments, the
manual performance tests, and the automated adjustments and
performance tests, see Chapter 5, “Service.”
Attention! Before performing this test, make sure the following conditions exist:
• The signal generator has had at least a one hour warm-up and has been
calibrated within the last year.
• The ambient temperature is 25 ±5 °C.
• The line voltage change is less than ±5%.