Rockwell Automation Publication 1756-UM001M-EN-P - February 2012 71
Start Using the Controller Chapter 3
4. Click Load.
After clicking Load, the project is loaded to the controller as indicated by
the controller status indicators.
Table 11 - Load Project Status Indicators
With these controllers These indications show the store status
1756-L6x While the load is in progress, the following occurs:
OK indicator on the controller is flashing green
A dialog box in RSLogix 5000 software indicates the store is in progress
When the load is complete, the following occurs:
OK indicator on the controller is momentarily red, then solid green
CF indicator on the controller is off
1756-L7x While the load is in progress, the following occurs:
OK indicator is solid red
SD indicator is flashing green
LOAD is shown on the status display
UPDT may be shown on the status display if the firmware is also updating with
the load
A dialog box in RSLogix 5000 software indicates the store is in progress
When the load is complete, the following occurs:
OK indicator on the controller is solid green
SD indicator on the controller is off
IMPORTANT
Allow the load to complete without interruption. If you interrupt the load, data
corruption or loss may occur.