Gearbox Installation (16" Frame)
Page 1 of 5
SECTION B-B
17
18
4313
25 15 34
263415
1-7
1-6
1-6
313415
243415
1-6
1-6
1-8
A
A
B
B
8
33
REF
1-7
1-7
1-7
SECTION A-A
1-1
1-1
2
5
17
18
13
16 27 28 29 30
134327282930
13 14 15
9 10
19
22
131415
32
1-5
1-5
1-9
1-10
1
21
1-11
1-1
NOTES:
SHIM GEARBOX TO ALIGN CRANK ARM PIN HOLE WITH
DRIVE ARM PIN HOLE IN 4 QUADRANTS IN ITS
RANGE OF MOTION.
16" CHAMBER & PLUNGER ASSY. SHOWN, REFER TO CHART FOR
PLUNGER ASSEMBLIES FOR OTHER CHAMBER SIZES.
SHIM AS NEEDED FOR STOP DOG TO FULLY ENGAGE PLUNGER STOP.
USE LOCTITE #242.
ADD 12.7 LBS (6.62 LITERS) OF LUBRICATING OIL TO GEARBOX.
OIL LEVEL SHOULD BE LEVEL WITH THE SIGHT GAUGE IN
LOWER SECTION OF GEARBOX ASSY.
TORQUE
SIDE PLATE BOLTS TO 365 FT-LBS.
PHOTO SHEET FOR SIDE PLATE BOLT CONFIGURATION IS AVAILABLE
FOR REFERECE UNDER CHART DRAWING (906223).
INSTALL ITEM 33 AT THIS LEVEL, IT IS CALLED OUT IN THE SHIELD GROUP.
CONFIRM STOP DOG (ITEM 9) EXTENDS AT LEAST 1/2" BEYOND CHAMBER LINER.
OIL FILL LOCATION OF GEARBOX
NOTE ORIENTATION OF RIBS ON SIDE PLATE
USE LOCTITE #243 ON SET SCREW
1-2
1-3
1-4
1-5
1-6
1-7
1-8
1-9
1-10
1-11
1-12
PLUNGER STOP DOG
19
10
11
9
12
11
1-3
1-3
21
1-4
22
1-9
44
1-12
7
26
89-096 Rev: 11-2016

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Allied Systems Freeman 370 and is the answer not in the manual?

Allied Systems Freeman 370 Specifications

General IconGeneral
BrandAllied Systems
ModelFreeman 370
CategoryFarm Equipment
LanguageEnglish