EasyManuals Logo

Allied Telesis AT-GS900M Series Installation Guide

Allied Telesis AT-GS900M Series
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #37 background imageLoading...
Page #37 background image
AT-GS908M, AT-GS916M, and AT-GS924M Switches Installation Guide
37
Unpacking the Switch
To unpack the switch, perform the following procedure:
1. Remove all of the components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. In addition to the switch, verify that the shipping container includes the
following items shown in Figure 7 on page 38.
Note
For the AT-GS908M, rack mounting equipment (brackets and
screws) is not included in the shipping package and must be
purchased separately. Its rack mounting kit model number is AT-
RKMT-J05.

Table of Contents

Other manuals for Allied Telesis AT-GS900M Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Allied Telesis AT-GS900M Series and is the answer not in the manual?

Allied Telesis AT-GS900M Series Specifications

General IconGeneral
BrandAllied Telesis
ModelAT-GS900M Series
CategorySwitch
LanguageEnglish

Related product manuals