EasyManuals Logo

Allied Telesis AT-GS900M Series Installation Guide

Allied Telesis AT-GS900M Series
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #38 background imageLoading...
Page #38 background image
Chapter 2: Installation
38
Figure 7. Shipping Package Contents
Retaining clip
Management cable
Four rubber feet
One regional AC
power cord
One, two, or four SFP
slot dust covers
(pre-installed).
(for desktop installation)
Two equipment rack
brackets
(not included in AT-
GS908M package)
Four or six bracket screws
(not included in AT-
GS908M package)
AT-GS916M: 4 each
AT-GS924M: 6 each
AT-GS916M
brackets
AT-GS924M
brackets
(pre-installed)

Table of Contents

Other manuals for Allied Telesis AT-GS900M Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Allied Telesis AT-GS900M Series and is the answer not in the manual?

Allied Telesis AT-GS900M Series Specifications

General IconGeneral
BrandAllied Telesis
ModelAT-GS900M Series
CategorySwitch
LanguageEnglish

Related product manuals