EasyManua.ls Logo

Allied Telesis AT-GS950/24 - Chapter 26: Cable Diagnostics

Allied Telesis AT-GS950/24
366 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
327
Chapter 26
Cable Diagnostics
This chapter provides procedures to run cable diagnostics on the cables
connected to the switch ports. If a port is selected, a cable must be
connected to it for meaningful test results to be displayed.
Note
To permanently save your new settings or any changes to the
configuration file, select Save Configuration to Flash from the main
menu on the left side of the page.
To do these cable diagnostics, perform the following procedure:
1. From the main menu on the left side of the page, click the Tools folder.
The Tools folder expands.
2. From the Tools folder, select Cable Diagnostics.
The Cable Diagnostics page is displayed. See Figure 117.
Figure 117. Cable Diagnostics Page
3. Select the Port number from the drop-down menu.
4. Click Test Now.
5. The following information is displayed:
Port - This parameter displays the port (cable) selected.

Table of Contents

Other manuals for Allied Telesis AT-GS950/24

Related product manuals