85ARX 23-2 T4i, ARX 26-2 T4i
OPERATING MANUAL
ROPS lowering
Remove the split pins.
Dismount the front frame screws on the left and right sides.
Tilt the ROPS safety frame to the back and secure it in asuitable
way.
Tilt and lift the ROPS with the help of another person.
There is arisk of injury from the falling ROPS.
Do not operate the machine when the ROPS is lowered.
There is arisk of fatal injury.
Lower the ROPS only during the transport.
The tightening torque of the ROPS screws is 147Nm.