84 ARX 23-2 T4i, ARX 26-2 T4i
2.7 Machine operation and use
2.7.10 ROPS lifting and lowering
Only lower or raise the ROPS frame with the help of another per-
son.
ROPS lifting
Lift the ROPS to the vertical position and mount the front screws
of the ROPS on the left and right side.
Mount the cotter pins.