EasyManuals Logo

Applied Biosystems QuantStudio 3 User Manual

Applied Biosystems QuantStudio 3
18 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #14 background imageLoading...
Page #14 background image
Materials for installation and operation
Ensure the following materials are av
ailable before installation of the instrument.
Safety glasses, lab coats, and chemical-resistant, disposable gloves (powder-free)
Easily accessible specied power outlet
(Optional) Electrical protective devices (universal power supply unit, surge
protector, and/or power line regulator)
(Optional) External network connection
Refrigerator or cold-room (4°C)
Freezer (–20°C)
Lint-free tissues
Water
Additional supplies and consumables are necessary for routine operation of the
instrument. For information about these additional supplies, see the user
documentation provided with the instrument. Use only supplies as specied by
Thermo Fisher Scientic.
Installation
mat
erials
Operation
materials
Materials for installation and operation
14
QuantStudio
3 and 5 Real-Time PCR Systems Site Preparation Guide | MAN0010405 C.0

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Applied Biosystems QuantStudio 3 and is the answer not in the manual?

Applied Biosystems QuantStudio 3 Specifications

General IconGeneral
BrandApplied Biosystems
ModelQuantStudio 3
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals