EasyManua.ls Logo

ASV RC-100 - Tandem Pump Installation; Hydraulic Reservoir Clean-out

ASV RC-100
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rubber Track Loader
9. Transmission and Drive Disassembly and Assembly
9-5
Figure 9-13
Tandem Pump Installation
1. Install the mounting bolts (with spring lock washer
and flat washer) on the tandem pump, at 85 ft.-lb.
with blue loctite.
Figure 9-14
Figure 9-15
2. Install the hoses and tubes on the tandem pump.
Hydraulic Reservoir Clean-out
If there has been a pump failure it is necessary to
clean out the hydraulic reservoir, as well has hoses,
tubes and hydraulic lines.
Figure 9-16
Figure 9-17
Pump shaft
Install
Bolt

Table of Contents