EasyManuals Logo

Atag XL75W User Manual

Atag XL75W
108 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #53 background imageLoading...
Page #53 background image
53
Filling the system
The central heating installation needs
WREH¿OOHGZLWKSRWDEOHZDWHUDFFRUGLQJ
to the requirements in chapter ‘Water
quality’. When the boiler has been
electrically commissioned, then the
KHDWLQJV\VWHPFDQEH¿OOHG)RU¿OOLQJ
or topping up the installation use the
following procedure:
1. Leave the power on the boiler
 &RQQHFWD¿OOLQJWDSWRWKHUHWXUQ
of the hydraulic circuit and open it.
3. Connect a hose on the manual
deaerator (A) and open it to
remove the air.
4. Close the manual deaerator
when water is constantly coming
out from it.
 6ORZO\¿OOWKHFHQWUDOKHDWLQJ
system up to 1.5 – 2 bar, Digital
pressure reading is shown in the
middle of the Home screen.
 &ORVHWKH¿OOLQJWDS
7. Vent the entire heating installation
starting at the lowest point.
8. Check the water pressure and top
up if necessary to 1.5 – 2 bar.
 'LVFRQQHFWWKH¿OOLQJKRVHIURPWKH
hydraulic circuit.
When powering up the boiler an
automatic air purge program will run
to vent the boiler (‘Airpurge active’).
This will last for approximately 7
minutes. During this program the
pressure in the central heating needs
to be checked, and when necessary,
topped up again.
It may take some time before all
the air has disappeared from a
¿OOHGLQVWDOODWLRQ&HUWDLQO\GXULQJ
WKH¿UVWZHHNQRLVHPD\EHKHDUG
that indicate air. The automatic air
vent (B) in the boiler will let this air
HVFDSHFDXVLQJWKHZDWHUSUHVVXUH
to drop during this period and the
water pressure needs topping up
again.
Hot water supply
Fill the hot water supply by opening the
cold mains isolation valve.
Bleed the hot water installation by
opening all hot water taps one at a
time. Leave the water running until all
air has disappeared from the supply.
Flush with a minimum of 10 litres to
rinse any residual contaminants from
the hot supply.
Installation
Filling the system
25/03/19 09:00
–10
°
1.5 bar
CH Pump Overrun
1 2
T10
BMS
32
°
A
B

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atag XL75W and is the answer not in the manual?

Atag XL75W Specifications

General IconGeneral
BrandAtag
ModelXL75W
CategoryBoiler
LanguageEnglish

Related product manuals