EasyManua.ls Logo

AUMA SA3 - 11 Checklists; Commissioning Checklist; Proof Test Checklists; Safe ESD Safety Operation (Safe OPENING;CLOSING)

AUMA SA3
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
39
11 Checklists
11.1 Commissioning checklist
Table 16: Commissioning checklist
11.2 Proof test checklists
If the proof test is performed according to proof test checklists, the pertaining NOTICES
contained in the <Tests and maintenance> chapter have to be observed.
11.2.1 Safe ESD safety operation (Safe OPENING/CLOSING)
Proof test checklist for version or configuration:
Safe ESD function “Safe CLOSING” (Safe ESD in direction CLOSE)
Safe ESD function “Safe OPENING” (Safe ESD in direction OPEN)
Irrespective of type of seating
Also, valid for combination of Safe ESD with Safe STOP.
Table 17: Proof test checklist
11.2.2 SIL fault signal “Actuator monitoring”
Proof test checklist for version or configuration:
Safe ESD function “Safe CLOSING” (Safe ESD in direction CLOSE)
Safe ESD function “Safe OPENING” (Safe ESD in direction OPEN)
Irrespective of type of seating
Also, valid for combination of Safe ESD with Safe STOP.
Multi-turn actuators
SA series with Control 3.XX /NI/SIL

Table of Contents

Related product manuals