4 Operation
4.1 Powering On
Once all electrical connections have been safely made, switch on the power to the circuit from the
circuit breaker and wait for the power supply to come on. There will be a series of self-checks. Make
sure that the charger works correctly and safely.
WARNING
Be careful when working with electricity.
AVERTISSEMENT
Soyez prudent lorsque vous travaillez avec de l'électricité.
4.2 One-stop Commissioning (For Commercial Use)
The commissioning of the chargers will be completed by the owner or the site operator, the installer
and the commissioning personnel. The steps are as follows.
— The owner or the site operator adds the devices, creates the site, configures the devices and
designates the installation ticket on the Autel Operation and Maintenance Platform.
— The installer installs the chargers and checks the installation.
— The commissioning personnel synchronizes the configuration to the chargers.
NOTICE
The installer and the commissioning personnel can be the same person.
The screenshots in this section take the case of the MaxiCharger AC Pro as
an example.
NOTE
Le personnel de mise en service et l'installateur peuvent être la même
personne.
Les captures d'écran de cette section prennent le cas du MaxiCharger AC Pro
comme exemple.