• IP address information configuration on page 51
• Stack configuration on page 53
Installation Preparation
This task flow shows the sequence of procedures you perform to prepare for ERS 5500
installation.
Installation Preparation Task Flow
Navigation:
• Installation preparation on page 57
• Verifying environment suitability on page 57
• Verifying the contents of the box on page 60
Switch placement
This task flow shows the sequence of procedures you perform to place the switch.
Installation Preparation
Avaya Ethernet Routing Switch 5000 Series Installation December 2010 47