Figure 17: Job aid: Grounding lug location on a 5600 Series switch
Installing transceivers
This procedure describes the steps used to install transceivers.
1. Remove the transceiver from the protective packaging.
2. Verify that the transceiver is the correct model for the network configuration.
3. Grasp the transceiver between the thumb and forefinger.
4. Insert the transceiver into the proper module on the switch. Apply a light pressure
to the transceiver until it clicks and locks into position in the module.
5. Remove the dust cover from the transceiver optical bores.
Job Aid
The following graphic shows and SFP tranceiver.
Procedures for installation of the switch
80 Avaya Ethernet Routing Switch 5000 Series Installation December 2010

Table of Contents

Other manuals for Avaya 5000 Series

Related product manuals