MD-6XP Mid-Rise Scissor Lift 10 P/N 5900108 — Rev. F — March 2020
Installation Checklist
Following are the steps needed to install an MD-6XP Lift. Perform them in the order shown.
☐ 1. Review the installation Safety Rules.
☐ 2. Make sure you have the necessary Tools.
☐ 3. Select the Installation Site.
☐ 4. Planning for Electrical Work.
☐ 5. Check clearances.
☐ 6. Unloading and unpacking.
☐ 7. Set up the Tow Cart.
☐ 8. Attach the Power Unit to the Portable Stand.
☐ 9. About Hydraulic Fluid Contamination.
☐ 10. About Thread Sealants.
☐ 11. Connect the Hydraulic Hoses.
☐ 12. Install the Lift Arms.
☐ 13. Fill the Hydraulic Fluid Reservoir.
☐ 14. Connect the Power Unit.
☐ 15. Install a Thermal Disconnect Switch (Electrician
required
).
☐ 16. Test the Lift.
☐ 17. Review the Final Checklist.