EasyManuals Logo

BendPak XPR-10 User Manual

BendPak XPR-10
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #12 background imageLoading...
Page #12 background image
12
6. Route both hoses in their respective posts PRIOR to
raising posts to their vertical position. When routing the
hydraulic hoses through the post, make sure to route
through the hose clips welded inside each post. Make
sure that the hoses are clear of any moving parts. It
may be necessary to tie hoses clear of obstructions by
using nylon tie straps or wire. Refer to Step 10 for further
instructions.
CAUTION !
BE SURE TO ROUTE THE HYDRAULIC HOSES
THROUGH THE HOSE CLIPS WELDED INSIDE
EACH POST.
Fig 3.10
NOTE:
“XPR -10” models: both Equalizer Cables are the same length.
Overhead Assembly sheaves ARE NOT staggered.
“XPR-10A” models: have one short and one long Equalizer Cable.
Overhead Assembly sheaves ARE staggered.
EQUALIZER CABLE ROUTING
XPR-10A wide con guration shown.
SHORT CABLE
(“A” Models)
THREADED
END
BUTTON
END
NOTE:
BE SURE TO ORIENT THE HYDRAULIC FITTINGS
ON CYLINDER AS SHOWN IN FIG 3.7.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BendPak XPR-10 and is the answer not in the manual?

BendPak XPR-10 Specifications

General IconGeneral
Capacity10, 000 lbs
Lift TypeTwo-Post Lift
Lifting Time45 seconds
Voltage220V
Minimum Height4.5 inches
Max Lift Height69 inches
Power Requirements220 VAC / 60 Hz / 1 Ph
Overall Height145" / 3683 mm

Related product manuals