1. Install the Foot Guards to the outside of the 4 Lift Arm
Assemblies. Tighten the Hex Head Bolts. (See Fig 1-2)
OPTIONAL FOOT GUARD INSTALLATION
Optional Equipment available through your Authorized BendPak Dealer.
OPTIONAL CRADLE AND SCREW PAD ADAPTERS
Footguards
Footguards
Footguards
Hex Head
Bolt
SCREW PAD ADAPTER FRAME CRADLE PAD ADAPTER

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BendPak XPR-10 and is the answer not in the manual?

BendPak XPR-10 Specifications

General IconGeneral
Capacity10, 000 lbs
Lift TypeTwo-Post Lift
Lifting Time45 seconds
Voltage220V
Minimum Height4.5 inches
Max Lift Height69 inches
Power Requirements220 VAC / 60 Hz / 1 Ph
Overall Height145" / 3683 mm