KW-231-14
When working on the electrical and/or electronic
system, please observe the following
WARNING
Risk of electric shock!
Before working on the terminal box, module
housing and electrical lines: Switch off the main
switch and secure it against being switched on
again!
Close the terminal box and the module housing
before switching on again!
!
!
NOTICE
The compressor module may be damaged or
fail!
Never apply any voltage to the terminals of CN7
to CN12 – not even for test purposes!
The voltage applied to the terminals of CN13
must not exceed 10V!
The voltage applied to terminal 3 of CN14 must
not exceed 24V! Do no apply voltage to the
other terminals!
Never apply voltage to the voltage outputs, not even for
testing.
3 Mounting the CM-RC-01 basic kit
Procedure to follow for mounting the CM-RC-01 basic
kit of the compressor module add-on kit:
• Mounting the cable holders and cable ties.
• Removing the SE-B* protection device.
• Electrical connection of the oil heater to the com-
pressor module.
• Mounting the discharge gas temperature sensor.
• Mounting the oil monitoring device.
• Laying the cables and closing the cable ties.
• Closing the cover, screwing the compressor module
to the terminal box.

Table of Contents