EasyManua.ls Logo

Blaze King 6003 - Installation Instructions; Through Roof Framing; Termination Above Roof

Default Icon
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OM6003.PUB Page 17 DATE PRINTED: 4/7/11
© Blaze King Industries Canada Ltd June 2006 Version 1.07SIT
The Contemporary by Blaze King Owners Installation and Operation Manual
Through Roof Framing
Maintain 10” opening relative to the pitch of the
roof.
10” square
Use a suitable round or square support
through the roof. Ensure adequate heat
shield protection is provided.
Termination Above Roof
Consult local codes for minimum vent cap height
above the roof, vent must be a minimum 2’ from
any wall.
To prevent water seepage install the flashing
with upper portion slid under the roofing material
and the lower portion over the roofing material.
Note: Do not fasten down until the final
adjustments to the vent have been made.
Installation Instructions

Related product manuals