JUST POWER ON 35
6. System Installation
6.1 Installation Procedure
Danger
When the EP800 is not activated, the grid side and off-grid side are
directly connected. Therefore, it is important not to touch any
exposed terminals to ensure safety.
When the grid side is powered on, the off-grid side will also be
energized with AC output. Please strictly adhere to safety operating
procedures to avoid electric shock.
Before installation, disconnect all circuit breakers for the battery pack,
solar system, and the main switch of the grid to ensure safe operations.
Required minimum space for the EP800 system installation is 23.15 m
3
.
Start
Preparation
Stacking the batteries
Installing the inverter
Installing the IoT controller
Electrical Connection
System Check
End