7.1 Preliminary Check
Check the followings before first use.
• Confirm that all components of the system are installed according to specific
requirements.
• Make sure the PV+ / PV- and BAT+ / BAT- cables are connected with correct polarity
and proper voltage.
• Switch off all AC and DC circuit breakers.
• Circuit breakers should be selected according to the requirements of this manual
and local regulations.
• Make sure grid and load cables are held firmly in place.
• All safety signs and warning labels shall be firmly attached and clearly visible when
needed.
7. System Check