EasyManua.ls Logo

BobsCNC QUANTUM MAX - Page 165

Default Icon
176 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
164
Step 1 Attaching the Spoilboard to the Torsion Box
Assembly. The MDF Sections will overhang the
front and back end supports ⅛ inch. The Aluminum
T-Slots will fit flush to the front and back of the end
supports.
Step 1a Fill the T-slots with sixty M4 Nuts. Cover the T-
slots with blue painter’s tape to hold the M4
Nuts in place during the installation process.

Related product manuals