8 Commissioning
WARNING
Danger while working in the danger zone of amachine/system!
Danger to life, risk of injury or serious injury!
▶ Pay attention to and eliminate potential danger sources before commissioning
the axial piston unit.
▶ Make sure no one is in the danger zone of the machine/system.
▶ The emergency stop button for the machine/system should be within the
operator's reach.
▶ Always follow the instructions of the machine/system manufacturer during
commissioning.
CAUTION
Commissioning an incorrectly installed product!
Risk of injury and property damage!
▶ Make sure all electrical and hydraulic ports are connected or plugged.
▶ Commission only afully installed, fully functioning product with original
accessories from BoschRexroth.
8�1 Initial commissioning
During all commissioning work on the axial piston unit, observe the general
safety instructions and intended use detailed in chapter 2 "Safety instructions"
on page 8.
▶ Connect the pressure gauge for the working pressure, case pressure and suction
pressure to the specied measuring points on the axial piston unit or in the
hydraulic system, to check the technical data at rst operation.
▶ During commissioning, monitor the temperature of the hydraulic uid in the
reservoir to ensure that it lies within permissible viscosity limits.
8�1�1 Filling the axial piston unit
Professional lling and air bleeding is required to prevent damage to the
axial piston unit and to maintain proper function.
Usually, the cleanliness level of commercial hydraulic uids is insufcient for
the requirements of our components. These hydraulic uids must be ltered
during lling using an appropriate lter system to minimize solid particle
contamination and water in the system.
Use only ahydraulic uid that corresponds to the following requirements: