EasyManua.ls Logo

BT SWE140L - 18.1.2 Maintenance

BT SWE140L
230 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18 – 2 Repair manual SWE100, 120, 120L, 120S, 140, 140L, 200D © BT
Lift mast – 7000
Main mast 7100
T code Valid from serial no. Date Order no.
841×842×843 6061850- 2012-08-30 258946-120
18.1.2 Maintenance
Fixing point
According to the maintenance chart, the mast mounting bolts (8) should
only be visually inspected and not re-tightened on inspection. If the
mast needs to be replaced or if the bolts have come loose, then be sure
to use new bolts and washers. The tightening torque should be
according to the torque table.
Lubrication
Lubricating the beam
1 The inside of the beam flanges are lubricated with (Q8
Rembrandt EP2).
https://www.besttruckmanuals.com/

Table of Contents

Related product manuals