EasyManua.ls Logo

Cafection Encore VENTI - Equipment Leveling Steps; Hot Water Tank Preparation

Cafection Encore VENTI
87 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENCORE VENTI Rev. 3 2021-10
www.cafection.com 800-561-6162
20
SERVICE & INSTALLATION MANUAL for Cafection's Encore Venti
Initial Setup
4.4 Leveling the Equipment
For optimal performance of the equipment, it is important to ensure that it is leveled. Avoiding to do
so can create variations in product delivery.
1. Place a level indicator on the internal waste bin shelf.
2. Adjust the four (4) threaded leveling glides of the equipment to reach a leveled position.
4.5 Hot Water Tank Preparation
Make sure the equipment is unplugged!
4.5.1 Tank Lid Preparation
1. Access the water tank by removing the water tank
access door or the back panel.
2. Locate the water tank and remove the twist tie
securing the float of the water tank.
3. Remove the silicone tubing from the heating
element.
4. Connect the white wire to the prong on the heating
element.
5. Replace the access panel.
Heater safety
switch
Water safety switch
(float)
Heating element wire
Heater safety switch
Left Side View
Water safety switch
(float)
Right Side View
Water tank access door
(under the plastic top)

Table of Contents

Other manuals for Cafection Encore VENTI

Related product manuals