8. Find 3rd Cut/Fill
[Cut/Fill] – 10 FT CUT
Solve for 4th Cut/Fill mark
9. Enter 4th existing elevation
11.8 [Feet] [Exist]
10.Find 4th Cut/Fill
[Cut/Fill] 3.7 FT FILL
Cubic Yards of Cut/Fill – Grid Cell
Method
The four corner elevations of a Grid
cell are 75.4 feet, 77.5 feet, 74.6 feet,
and 80.5 feet. If the proposed eleva-
tion is 83 feet, and the area of the Grid
is 2,000 square feet, what is the vol-
ume (in cubic yards) of cut or fill
required for this Grid cell?
Steps/Keystrokes Display
1. Clear calculator
[On/C] [On/C] 0.
Find Average Existing Grid Elevation
2. Enter 1st through 4th elevation (in
Memory)
75.4 [Feet] [M+]
77.5 [Feet] [M+]
74.6 [Feet] [M+]
80.5 [Feet] [M+]
44 – HeavyCalc™

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Calculated Industries HeavyCalc and is the answer not in the manual?

Calculated Industries HeavyCalc Specifications

General IconGeneral
BrandCalculated Industries
ModelHeavyCalc
CategoryCalculator
LanguageEnglish

Related product manuals