EasyManua.ls Logo

CapstanAG PinPoint II - User Manual

CapstanAG PinPoint II
144 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
TM
PinPoint™ II
Spray Application
Configurations:
Synchro™ Mode
SharpShooter™ Mode
Operator Manual
122200-210 Rev. D | Revised 02/2020 | ©2020 Capstan Ag Systems, Inc.

Table of Contents

Other manuals for CapstanAG PinPoint II

Questions and Answers

Summary

Chapter 2: Safety

Chapter 4: System Installation

Prepare for Installation and Setup

Important pre-installation steps and general guidance.

Valve Assembly Types and Component Identification

Identification and part numbers for valve components.

Assemble the Nozzle Valves

Step-by-step instructions for assembling nozzle valves.

Install the Gateway Hub

Steps to locate and mount the Gateway hub.

Install the VCMs

Steps to locate and install VCMs on boom sections.

Install the Pressure Sensor

Instructions for installing the system's pressure sensor.

Install the Flowmeter Harness

Connecting the flowmeter harness to the Gateway hub.

Install the CapView

Mounting and connecting the CapView display unit.

Install the Battery Harness

Connecting the battery harness to the Gateway hub.

Install the Circuit Breaker

Instructions for installing the circuit breaker.

Chapter 5: System Setup

Start the CapView

Step-by-step guide to starting the CapView and rate controller.

System Setup

Overview of system setup procedures required after installation.

Factory Reset

When and how to perform a factory reset of the system.

Do the Factory Reset Procedure

Detailed steps to perform a factory reset.

Do the Location Setup Procedure

Steps to perform the automatic location setup.

Do the Nozzle Spacing Setup Procedure

Procedure for setting up nozzle spacing and orientation.

Chapter 6: Operation

Operate in Automatic Pressure Control (AUTO) Mode

How to operate the system in automatic pressure control mode.

Chapter 7: Maintenance

Clean the Nozzle Valve(s)

Step-by-step guide to cleaning nozzle valves.

Plunger Seal Inspection

How to inspect plunger seals for wear and damage.

Update PinPoint II Software

Procedure for updating PinPoint II and CapView II software.

Chapter 8: Troubleshooting

Troubleshooting Charts

Tables detailing system errors, causes, and corrections.

Interchange the Components

Using component interchange for troubleshooting.

Coil Assembly Test

Testing coil assemblies for resistance and faults.

Circuit Breaker

Understanding circuit breaker operation and reset procedures.

Battery Voltage Test

Steps to test battery voltage and identify power issues.

Do a Check of the System Load Capacity

Testing system load capacity and voltage under load.

VCM Voltage Test

Procedure to test voltage at the VCM connectors.

Boom Shutoff Signal Test

Testing the boom shutoff signal to the VCM.

Power to the Pressure Sensor Input Test

Verifying power supply to the pressure sensor.

Pressure Sensor Signal Test

Testing the signal output from the pressure sensor.

CapstanAG PinPoint II Specifications

General IconGeneral
ManufacturerCapstanAG
CategoryController
Product NamePinPoint II
Communication ProtocolCAN bus
Protection RatingIP67
Output Current2A
Operating Temperature-40°C to +85°C