Operation
Spray Without the PinPoint
II System
To spray without the PinPoint
system, use one of these:
CapstanAG nozzle valves
Alternate valve bodies
Spray Through the CapstanAG Nozzle Valves
The display must be off.
The rate controller will control the rate.
The nozzle valves will open and close with the boom signal (without pulsing).
Spray Through Alternate Valve Bodies
Note: Use of alternate valve bodies is recommended for high flow applications (30 gal or more per
acre) if you do not have CapstanAG high-flow valve assemblies.
If using WILGER nozzle bodies:
Disconnect the key switched power harness connector from the CapView harness.
Install a cap onto the connectors.
The CapView must be off.
The rate controller will control the rate.
Manually open the drip checks.
©
2020 Capstan Ag Systems, Inc. 77 PinPoint