10 - SYSTEM START-UP 
10.1 - Checks before system start-up
Before starting up the thermodynamic system, the complete 
system,  including  the  thermodynamic  system,  must  be  veried 
against the installation drawings, dimensional drawings, system 
piping and instrumentation diagrams and the wiring diagrams. 
All measures must be taken to ensure that the pressure and 
temperature limits, specically those listed on the unit nameplates, 
are not exceeded during operation, maintenance and recycling. 
Heat exchange fluid temperatures above the maximum 
recommended can lead to an increase in the refrigerant pressure 
and can cause a loss of refrigerant due to the relief valve discharge.
National regulations must be respected during these checks. 
 
If the national regulation does not specify any details, refer to 
standard EN 378 as follows:
External visual installation checks:
 - Ensure that the machine is charged with refrigerant. Verify 
on  the  unit  name  plate  that  the  ‘uid  transported’  is  that 
recommended for operation, and is not nitrogen.
 - Compare the complete installation with the refrigeration 
system and power circuit diagrams.
 - Check that all documents provided by the manufacturer 
(dimensional drawings, pipe and instrument diagram (PID), 
declarations, etc.) to comply with the regulations are present. 
If any documentation is missing, order a replacement.
 - Make sure the environmental safety and protection devices 
and arrangements provided by the manufacturer to comply 
with the regulations are in place.
 - Make sure all declarations of conformity for the pressure 
containers, identication plates and documentation required 
to comply with local regulations are present.
 - Verify the free passage of access and safety routes.
 - Comply with the instructions and directives to prevent the 
deliberate release of refrigerant uids.
 - Verify the installation of connections.
 - Verify  the supports and xing elements (materials, routing 
and connection).
 - Verify the quality of welds and other joints.
 - Check the protection against mechanical damage.
 - Check the protection against heat.
 - Check the protection of moving parts.
 - Verify the accessibility for maintenance or repair and to check 
the piping.
 - Verify the status of the valves.
 - Verify the quality of the thermal insulation.
 - Check the condition of 400 V cable insulation.
10.2 - Commissioning
Always ensure you have read and fully understood the operating 
instructions for the units before starting up the unit, and ensure 
the following precautions have been taken:
 - Check the heat-transfer fluid circulation pumps, the air 
handling equipment, and any other equipment connected to 
the heat exchangers.
 - Refer to the manufacturer’s instructions.
 - Refer to the electrical diagram delivered with the unit.
 - Ensure there are no refrigerant leaks. Check the tightening 
of the fastening clips on all the pipes.
 - Check the power supply at the main connection point and 
the order of phases.
 - For units without the factory-tted hydraulic module option, 
the installer is responsible for heat protection and the 
connections relating to the installation's pump.
 - Check that the compressor crankcase heaters, and the 
compressor head heaters if applicable, have been energised 
for 6 hours before starting up the system.
 - Open  the  suction  shut-o  valves  on  each  circuit  for  the 
corresponding units.
IMPORTANT:
Commissioning  and  start-up  must  be  supervised  by  a 
qualied technician.
 - The system must have a heat load and water owing in 
the exchangers when it is started up and tested.
 - All setpoint adjustments and control tests must be 
carried out before the unit is started up.
 - Refer to the Service guide.
Proceed with the unit commissioning.
Make sure all safety devices are operational, and especially 
that the high pressure switches are engaged and that any 
alarms have been cleared.
NOTE:
If the manufacturer's recommendations (system, water and 
power connections) are not observed, no claims made under 
the warranty will be accepted.
10.3 - Essential points to check
Compressors
Ensure that each compressor is rotating in the correct direction, 
checking that the discharge temperature rises quickly, the high 
pressure increases and the low pressure drops. If it is rotating in 
the wrong direction, the power supply is incorrectly wired (reversed 
phases). To  ensure  rotation  in  the  correct  direction,  swap  two 
power supply phases.
 - Check that the power cables are tightened securely in the 
terminal unit for each compressor.
 - Check the compressor discharge temperature using a contact 
sensor.
 - Check the input current; it should be normal.
 - Check all safety devices to make sure they operate correctly.
Hydraulic
As the exact total system pressure drop is not known at start-up, 
adjust the water ow rate with the control valve until the desired 
nominal rate is obtained.
Please  refer  to  the  chapter  “Nominal  system  water  ow  rate 
 
control -  Procedure  for adjusting the  ow  rate” for the  steps  to 
follow.
In any case, the hydraulic circuit must be free from pollution 
(removal of any solid particles in the circuit) before start-up: Please 
refer  to  the  chapter  “Nominal  system  water  ow  rate  control  - 
Procedure for cleaning the hydraulic circuit” for the steps to follow.
Refrigerant charge
Each unit is shipped with an exact charge of refrigerant and oil.
Check that there are no visible refrigerant or oil leaks:
 - No apparent damage on the refrigerant circuit pipes 
 
(no trauma, cracks, deformation)
 - No traces of grease on the connections and refrigerant circuit 
sensors
In case of doubt, use a refrigerant leak detection device suited to 
the uid in the unit.
47